Targeted Audience Dates and VenuesThe Need for Maintenance
- Failure Mode Effect & Criticality Analysis (FMECA)
- Causes of Failures
- Likelihood & Severity of Failure – Risk Analysis
- Reliability Centred Maintenance (RCM)
- Optimisation of Maintenance Decisions
- Failure Pattern Identification
- Statistical Analysis of Failures
- Weibull Analysis
- Zero Base Budgeting
- Define the production requirement
- Define the maintenance requirement
Developing the CMMS
- Database Construction
- Installed Asset Base
- Hierarchical Structure
- Procedures and Plans
- Resources
- Dedicated Manpower
- Contractors
- Specialist Tools
- Maintenance Strategies
- Centralised/Decentralised
- Life/Emergency/Corrective/Planned
- Planned & Predictive
The Planning Function
- Roles & Responsibilities
- The Planners
- Job Initiators
- Maintenance Trades
- Job Planning
- Planning Corrective Work
- Integrate Planning with Procedures
- Resource Levelling
- Scheduling
- Long Term Scheduling with Production
- Medium & Short Term Scheduling
- Planning Department Interfaces
Predictive Maintenance
- Potential Failure Analysis (PFA)
- Integration of PFA with FMECA & RCM
- Understanding the P-F Interval
- Decide which Technologies to Apply
- Vibration Analysis
- Detectable Faults
- Setup Parameters
- Monitoring & Protection
- On-Line or Off-Line
- Supporting Technologies
- Infrared Thermography
- Passive Ultrasonics
- Oil Analysis
Control of the Maintenance Process
- CMMS Integration
- Predictive Maintenance Interface
- Optimising PM Kit Usage with PdM
- Operational planning
- Reporting
- Monthly PM & PdM reports for Management
- Financial Feedback Reports
- Budget Control
- Key Performance Indicators
- Reliability & statistics – MTBF, Reliability etc.
- Work request backlog analysis
- Customer feedback analysis